DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard 10m, Black

by DELFINO
Best Price from 1 online shop
SAR 49.4 11%
from Amazon SA
SAR 1.3 including 12 SAR shipping.
Price was SAR 55 (11% drop)

DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs ... Price in Saudi Arabia

DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard 10m, Black - B08RS7BPZL | Price updated 5 days ago
Price was SAR 55 (11% drop)
Amazon SA
Delivery in 3-12 days More info
SAR 1.3
+ 12 Shipping

Description for DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs ...

  • The extra long line training dog leash, long lead for large, medium and small dogs - great for training, play, camping, or backyard 10m, black Pet Accessories is manufactured by DELFINO and was added around January 2022.
  • This version of the Pet Accessories comes in Color : Black , Meters : 10 Meter.